RSS 140 Rapid
Settlement Plant

Clean My Water

Process your slurry in REAL TIME with no require scheduled downtime for ongoing maintenance in most applications.

RSS - Rapid Settlement 140 Plant

RS-140

Inclined plate clarifier with 100’S square Feet of HDPE Plates to greatly increase water clarity.

Control Panel

Provides user defined settings to allow for complete control over your system.

Polymer Feed System

Proprietary polymer introduced to your slurry as it enters the clarifier to ensure faster settling.

Sludge Bag & Skid

Galvanized dipped forkliftable skids that allow easy handling of sludge dewatering bags.

Repress Pump Skid

Programable pump skids are spec'd to provide adequate pressure back to your cutting equipment.

Slurry Pit Storm

Optional pit stir system keeps solids from settling in the pit.

Rapid Settlement
140 Plant


  • Simple to use
  • Virtually no downtime
  • Over 95% of solids removed
  • Most popular system in the USA over the past 10 years

Solutions for slurry water

Clean My Water

Rapid Settlement 140 Plant

FCW developed the Rapid Settlement System Plants over 10 years ago and has over 500 systems throughout North America. Ever since we have worked hard to continuously improve the clarifier. Through ongoing customer feedback and staff input effective updates in performance and in design ensure the latest technologies and knowledge are thoughtfully incorporated.

The RS140 Plant is designed to operate around 100 to 120 gallons per minute in most wastewater applications. The wastewater plant utilizes our proprietary inclined plate clarifier to efficiently allow removal of approximately 90% of the suspended solids out of the wastewater in real time and with virtually no energy. The system requires very little staff maintenance compared with other liquid solid separation technologies. Plants incorporate many features and options including control packages, slurry pumps, chemical feed, mixing, liquid solid separation, dewatering, pH balancing.

FEATURES

  • RS140 Clarifier
  • Two-part epoxy paint over sandblast
  • 56% HDPE plates
  • Flanged cone bottom and output fittings
  • Polymer Feed System
  • Sludge Bag & Skid
  • Control Panel
  • Repress Pump Skid
  • Slurry Pit Storm

ADDITIONAL OPTIONS

  • Expandable construction for increased productivity
  • Filter press
  • Automated controls
  • Different height filter presses for meeting your current equipment needs
  • Filter press sludge dumpsters
  • Semi-automatic plate shifters
  • Fully automated filter presses
  • Incorporating new components into existing and used filter press equipment
  • Short term rentals available
Call

RS Systems

Learn More

Filter Press

Learn More

Chemical Feed

Learn More

Slurry Pit Storm

Learn More

“You guys were great to work with. I had a lot of issues getting my building ready and your guys were flexible and bent over backwards to help me, and the system runs great.”Alex Spagnolo, Sendona Marble & Granite
“I would recommend Full Circle Water to anybody.”Brad Norris, envyR Surfaces

St. Joseph, MN & Las Vegas NV

Two U.S. Locations to better serve your needs.